Building Performance Infrastructure for the Next Stage of Growth

High-Growth Organisation | c.25,000 employees | Scaling towards 40,000

The Challenge

A high-velocity organisation had grown rapidly from approximately 5,000 employees to 25,000 and expected to reach around 40,000 employees within five years.

Its Performance Management infrastructure had not evolved at the same pace.

Processes and systems originally designed for a much smaller organisation were increasingly struggling with the scale and complexity now required.

But the deeper challenge was organisational.

The business had historically operated through a highly entrepreneurial and federated management model. That model had supported growth and agility.

At 25,000 employees, however, the organisation increasingly needed to operate as one enterprise.

Performance Management sat directly at the intersection of those two realities.

How could the organisation create greater enterprise alignment without losing the agility that had made it successful?

Looking Beneath the Process

Interviews and questionnaires were used to understand how Performance Management actually operated across different populations and business areas.

The work exposed important differences between the formal framework and organisational reality.

Senior executives did not formally participate in the Group Performance Management process.

There was limited line of sight between executive scorecards and objectives further down the organisation.

Employee participation was optional, with significant numbers choosing not to participate.

Existing processes lacked some of the controls increasingly required at scale.

And Performance Management data provided limited visibility of whether the actions and behaviours the organisation wanted were actually occurring.

These weren't isolated process failures.

The organisation was outgrowing its performance infrastructure.

What We Discovered

Three interconnected issues became particularly important.

Executive accountability

It was difficult to establish Performance Management as an enterprise expectation while the organisation's most senior leaders remained outside the formal Group framework.

Strategic line of sight

Weak connections between executive scorecards and downstream objectives meant Performance Management could become administrative rather than a mechanism for translating strategy into contribution.

Scalability

Processes appropriate for 5,000 employees could not simply be stretched indefinitely. Greater scale required more disciplined architecture, stronger controls and better organisational information.

Viewed through what subsequently became SQUARED™, the dominant conditions were Structure, Quality, Accountability, Execution and Dynamics.

The Strategic Choice

The transformation was reframed from a Performance Management upgrade into part of the organisation's transition towards a more integrated enterprise.

Senior executives were formally brought into the Group Performance Management framework.

Executive specific performance forms were introduced alongside clearer timelines and processes.

The relationship between executive scorecards and downstream objectives was strengthened.

The Performance Management journey was simplified, while system gateways introduced greater discipline around how forms were deployed and progressed.

The relationship between performance ratings and pay was made clearer.

The objective wasn't bureaucracy or centralisation.

It was introducing the minimum viable enterprise discipline required to support continued growth.

Designing for Tomorrow's Organisation

The transformation was designed for where the organisation was going, not simply where it was.

Rather than wait for year-end, the redesigned system and executive forms were introduced during mid-year interim reviews.

This gave employees, managers and executives an opportunity to experience the changes, identify issues and build familiarity before the higher-stakes year-end cycle.

Guidance helped managers and employees navigate the new experience while reinforcing expected behaviours.

Targeted communications and leadership reinforcement supported adoption, with particular attention given to senior populations.

Performance data and analytics were also strengthened.

The organisation could increasingly see who was participating, how populations were progressing through key stages and whether desired actions were occurring.

Those insights could then trigger targeted behavioural nudges.

A feedback loop began to emerge:

Observe → Understand → Intervene → Reinforce → Improve

The interaction between Experience, Control, Enablement, Activation and Monitoring was becoming increasingly visible principles subsequently codified through Five-System Architecture™.

Client Impact

The transformation created a stronger and more scalable enterprise performance architecture.

It:

  • formally brought senior executives into Group Performance Management;

  • strengthened executive accountability;

  • improved line of sight between enterprise priorities and downstream objectives;

  • simplified employee and manager performance journeys;

  • introduced stronger system controls and gateways;

  • clarified the relationship between performance and pay;

  • strengthened manager and employee guidance;

  • used the mid-year cycle to de-risk implementation ahead of year-end;

  • improved Performance Management data and analytics; and

  • enabled more targeted behavioural interventions.

Most importantly, Performance Management began evolving from a partially adopted HR process towards enterprise infrastructure connecting strategy, leadership accountability and individual contribution.

The Enduring Insight

The visible problem was that processes and systems built for a smaller organisation were struggling with scale.

The deeper challenge was organisational.

A business built through federated entrepreneurial success needed sufficient enterprise alignment to support its next stage of growth.

Performance Management became one mechanism for creating that alignment.

Performance infrastructure must scale before organisational complexity overwhelms it.

 

Discuss a Similar Challenge →

Next
Next

Turning Manager Capability into Performance Capability